Power Beyond Valve Installation
Fit Rite Hydraulics
Your loader valve has 3 lines that have continuous
flow. These will be the larger hydraulic lines. The
pressure inlet, the Power Beyond (PB) and the outlet
or tank line.
You want to run a hose from the loader PB to the
pressure inlet of your new valve. Run a line connecting
the PB port of your new valve to the disconnected line
from the loader PB. Run the outlet line from your new
valve either to the tank directly or tee it into the outlet
line of your loader valve.
This should get you up and running.
I hope that this is a clear enough description for you to
get everything installed.